{"id":70601,"date":"2024-08-01T05:01:52","date_gmt":"2024-08-01T05:01:52","guid":{"rendered":"https:\/\/www.squareyards.ae\/blog\/?p=70601"},"modified":"2024-08-13T08:56:06","modified_gmt":"2024-08-13T08:56:06","slug":"dewa-electricity-network-modification-govart","status":"publish","type":"post","link":"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart","title":{"rendered":"DEWA Electricity Network Modification &#8211; Complete Application And Registration Process"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The <a href=\"https:\/\/www.squareyards.ae\/blog\/dubai-electricity-and-water-authority-govart\">Dubai Electricity and Water Authority (DEWA)<\/a> provides electricity and water services to Dubai&#8217;s residents. Among its various services, DEWA Electricity allows registered contractors and consultants to request modifications to the electricity network, such as relocating meters, substations, or cables. <\/span><i><span style=\"font-weight: 400;\">This blog outlines the steps and requirements for requesting such modifications, specifically focusing on requesting an <a href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\">electricity network modification<\/a> at DEWA.\u00a0<\/span><\/i><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_40 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" area-label=\"ez-toc-toggle-icon-1\"><label for=\"item-6a058cadb809c\" aria-label=\"Table of Content\"><span style=\"display: flex;align-items: center;width: 35px;height: 30px;justify-content: center;direction:ltr;\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/label><input  type=\"checkbox\" id=\"item-6a058cadb809c\"><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#What_is_an_Electricity_Network_Modification\" title=\"What is an Electricity Network Modification?\">What is an Electricity Network Modification?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Under_What_Circumstances_Might_It_Be_Necessary_to_Modify_a_Network\" title=\"Under What Circumstances Might It Be Necessary to Modify a Network?\">Under What Circumstances Might It Be Necessary to Modify a Network?<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#1_Increasing_Electrical_Load_Capacity\" title=\"1. Increasing Electrical Load Capacity\">1. Increasing Electrical Load Capacity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#2_New_Property_Construction\" title=\"2. New Property Construction\">2. New Property Construction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#3_Upgrading_Existing_Electrical_Systems\" title=\"3. Upgrading Existing Electrical Systems\">3. Upgrading Existing Electrical Systems<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#How_To_Prepare_Your_Application_for_DEWA\" title=\"How To Prepare Your Application for DEWA?\">How To Prepare Your Application for DEWA?<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Application_Submission\" title=\"Application Submission\">Application Submission<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Payment_of_Fees\" title=\"Payment of Fees\">Payment of Fees<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Technical_Review_and_Site_Inspection\" title=\"Technical Review and Site Inspection\">Technical Review and Site Inspection<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Required_Documents\" title=\"Required Documents\">Required Documents<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Customer_Information_Emirates_ID_or_Trade_License\" title=\"Customer Information (Emirates ID or Trade License)\">Customer Information (Emirates ID or Trade License)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Project_Specifics\" title=\"Project Specifics\">Project Specifics<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Nature_of_Modification\" title=\"Nature of Modification\">Nature of Modification<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Specific_Requirements\" title=\"Specific Requirements\">Specific Requirements<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Affection_Plan_For_Projects_In_Dubai_Free_Zones\" title=\"Affection Plan (For Projects In Dubai Free Zones)\">Affection Plan (For Projects In Dubai Free Zones)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Submitting_Your_Application_To_Dewa\" title=\"Submitting Your Application To Dewa\">Submitting Your Application To Dewa<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Applying_Online_Through_the_Dewa_Portal\" title=\"Applying Online Through the Dewa Portal\">Applying Online Through the Dewa Portal<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Applying_Offline_At_Dewa_Customer_Service_Centre\" title=\"Applying Offline At Dewa Customer Service Centre\">Applying Offline At Dewa Customer Service Centre<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#How_Do_You_Request_Dewa_Electricity_Network_Modification\" title=\"How Do You Request Dewa Electricity Network Modification?\">How Do You Request Dewa Electricity Network Modification?<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#1_Pre-Application_Requirements\" title=\"1. Pre-Application Requirements\">1. Pre-Application Requirements<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#2_Submission_of_the_Application\" title=\"2. Submission of the Application\u00a0\">2. Submission of the Application\u00a0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#3_Fees_and_Payment\" title=\"3. Fees and Payment\u00a0\">3. Fees and Payment\u00a0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#4_Site_Inspection_and_Technical_Review\" title=\"4. Site Inspection and Technical Review\">4. Site Inspection and Technical Review<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#5_Implementation_And_Permission\" title=\"5. Implementation And Permission\">5. Implementation And Permission<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#6_Process_Execution\" title=\"6. Process Execution\">6. Process Execution<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#7_Completion_And_Handover\" title=\"7. Completion And Handover\">7. Completion And Handover<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Frequently_Asked_Questions_FAQs\" title=\"Frequently Asked Questions (FAQ&#8217;s)\">Frequently Asked Questions (FAQ&#8217;s)<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#What_is_the_first_thing_to_remember_when_requesting_an_electricity_network_modification_from_Dewa\" title=\"What is the first thing to remember when requesting an electricity network modification from Dewa?\">What is the first thing to remember when requesting an electricity network modification from Dewa?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Are_there_any_fees_associated_with_the_application_process\" title=\"Are there any fees associated with the application process?\">Are there any fees associated with the application process?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#How_can_I_submit_my_application_for_an_electricity_network_modification\" title=\"How can I submit my application for an electricity network modification?\">How can I submit my application for an electricity network modification?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-31\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Who_is_responsible_for_carrying_out_the_modification_work\" title=\"Who is responsible for carrying out the modification work?\">Who is responsible for carrying out the modification work?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-32\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#What_does_the_execution_of_the_modification_work_involve\" title=\"What does the execution of the modification work involve?\">What does the execution of the modification work involve?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-33\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#What_is_the_cost_of_an_electricity_network_modification\" title=\"What is the cost of an electricity network modification?\">What is the cost of an electricity network modification?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-34\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#Who_should_we_contact_for_our_queries_about_network_modifications\" title=\"Who should we contact for our queries about network modifications?\">Who should we contact for our queries about network modifications?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-35\" href=\"https:\/\/www.squareyards.ae\/blog\/dewa-electricity-network-modification-govart\/#What_are_the_advantages_of_working_with_DEWA_for_network_modifications\" title=\"What are the advantages of working with DEWA for network modifications?\">What are the advantages of working with DEWA for network modifications?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"What_is_an_Electricity_Network_Modification\"><\/span><span style=\"font-weight: 400;\">What is an Electricity Network Modification?<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-70602\" src=\"https:\/\/www.squareyards.ae\/blog\/wp-content\/uploads\/2024\/08\/Electricity-Network-Modification.jpg\" alt=\"Electricity Network Modification(DEWA)\" width=\"1500\" height=\"1000\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">An electricity network modification refers to changes made in Dubai&#8217;s electrical network, controlled by the Dubai Electricity and Water Authority (DEWA). This service is for the contracted consultant and contractors requiring a change in the existing power network to fit a new construction, renovation, or enhancement project. They range from moving meters or substations to repositioning cables. These changes help maintain the electric supply&#8217;s efficiency and reliability while satisfying essential standards. It involves submitting and providing comprehensive work plans and documents, receiving technical scrutiny, and maybe site visits before getting approval and deployment by DEWA or its affiliated companies. This helps ensure that all the changes on the network comply with DEWA\u2019s strict standards and also considers the general structural integrity of the electrical network.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Under_What_Circumstances_Might_It_Be_Necessary_to_Modify_a_Network\"><\/span><span style=\"font-weight: 400;\">Under What Circumstances Might It Be Necessary to Modify a Network?<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">DEWA Service For Electricity Network Modification ensures changeovers adhere to safety standards and regulatory requirements.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">One might need a network modification in the following scenarios\u2013<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"1_Increasing_Electrical_Load_Capacity\"><\/span><span style=\"font-weight: 400;\">1. Increasing Electrical Load Capacity<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">As your property\u2019s demand for electricity grows, such as adding new appliances or expanding facilities, you may need to increase the electrical load capacity. This ensures your infrastructure can handle the additional power requirements without overloading the system, maintaining efficiency and safety.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"2_New_Property_Construction\"><\/span><span style=\"font-weight: 400;\">2. New Property Construction<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Upgrading the existing electrical system is essential for any major new construction or building. This includes installing new meters, substations, or cables to provide sufficient power supply and ensure compliance with DEWA&#8217;s rules and regulations.\u00a0<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"3_Upgrading_Existing_Electrical_Systems\"><\/span><span style=\"font-weight: 400;\">3. Upgrading Existing Electrical Systems<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Updating your electrical systems to help improve efficiency and safety or comply with updated regulations. This may include replacing outdated equipment, enhancing the capacity of the existing setup, improving energy efficiency or getting new technology. These updates help maintain a reliable electricity supply and reduce the risk of electrical failures and mishaps.\u00a0<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"How_To_Prepare_Your_Application_for_DEWA\"><\/span><span style=\"font-weight: 400;\">How To Prepare Your Application for DEWA?<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-70603 size-full\" src=\"https:\/\/www.squareyards.ae\/blog\/wp-content\/uploads\/2024\/08\/DEWA-Application.jpg\" alt=\"Prepare Your Application for DEWA\" width=\"1500\" height=\"1000\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">When preparing to apply for a modification to the electricity network with DEWA, make sure to have all the necessary documents and information to make the DEWA electricity network modification process more adept.<\/span><\/p>\n<ul>\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Application_Submission\"><\/span><span style=\"font-weight: 400;\">Application Submission<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Submit your application through DEWA\u2019s online portal or visit the DEWA customer service center.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Provide personal or business information, including <a href=\"https:\/\/www.squareyards.ae\/blog\/about-emirates-id-ntuart\">Emirates ID<\/a> or Trade Licence, and detailed project specifics.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Upload all prerequisite documents in the specified format.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Submit the affection plan, required if the project is in one of Dubai&#8217;s free zone areas, and the site layout plan showing the proposed meter or substation relocation location.<\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Payment_of_Fees\"><\/span><span style=\"font-weight: 400;\">Payment of Fees<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Requesting the service through DEWA\u2019s portal is free, but the modification service is chargeable. Fees vary based on the nature and extent of the modification and can be paid online through DEWA\u2019s e-Pay services.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Technical_Review_and_Site_Inspection\"><\/span><span style=\"font-weight: 400;\">Technical Review and Site Inspection<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">DEWA\u2019s technical team will review your application and documents and may conduct a site inspection to assess the feasibility of the requested modifications. This process assures compliance with DEWA\u2019s standards and regulations.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Required_Documents\"><\/span><span style=\"font-weight: 400;\">Required Documents<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Documents required for this procedure include\u2013\u00a0<\/span><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Site Plan<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Non-Objection Certificate<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Load Schedule\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Schematic Diagrams<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Approvals from Dubai Municipality or other regulatory bodies<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Affection Plan to ensure that the project is in the Dubai Free Zone<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Site Layout Plan\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Customer_Information_Emirates_ID_or_Trade_License\"><\/span><span style=\"font-weight: 400;\">Customer Information (Emirates ID or Trade License)<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">When submitting your application for electricity network modification with DEWA, it&#8217;s essential to provide accurate customer information. Including these documents ensures that DEWA can authenticate the applicant&#8217;s identity and the request&#8217;s legitimacy, facilitating a smooth application process.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The customer information includes\u2013<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\"><strong>Emirates ID<\/strong>\u2013 Individual applicants must provide a valid Emirates ID as proof of identity and residency in the UAE.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\"><strong>Trade License <\/strong>\u2014A valid trade license is required for business or corporate applications. This document verifies the company&#8217;s legitimacy and authorisation to operate within Dubai.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Project_Specifics\"><\/span><span style=\"font-weight: 400;\">Project Specifics<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">When preparing your application for DEWA, providing comprehensive project details ensures that DEWA understands the modification&#8217;s scope and technical needs, facilitating a smoother review and approval process.\u00a0<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Nature_of_Modification\"><\/span><span style=\"font-weight: 400;\">Nature of Modification<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Clearly describe the type of modification you are requesting. This could involve relocating meters, moving substations, or shifting cables. Specify why this modification is needed and how it will benefit the project.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Specific_Requirements\"><\/span><span style=\"font-weight: 400;\">Specific Requirements<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Outline the technical specifications and requirements for the modification. Include details such as the exact locations of the changes, the load capacity needed, and any specific technical or safety standards that must be met.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Affection_Plan_For_Projects_In_Dubai_Free_Zones\"><\/span><span style=\"font-weight: 400;\">Affection Plan (For Projects In Dubai Free Zones)<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">An affection plan is a vital document required for working on projects located in the free zones of Dubai when applying to modify the electricity network. This plan outlines the project area&#8217;s details, geographical features, and any proposed alterations to ensure compliance with the free zone land-use zoning laws.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Submitting an accurate Affection Plan helps DEWA and relevant authorities assess the feasibility and compliance of the proposed modifications, facilitating a smooth approval process.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">This plan must require the following\u2013<\/span><\/p>\n<ol style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><strong>Site Boundaries<\/strong>\u2013 Marked boundaries of the project site.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><strong>Proposed Modifications<\/strong>\u2013 Locations for new or relocated meters, substations, or cables.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><strong>Compliance<\/strong>\u2013 Adherence with free zone authority regulations and DEWA standards.<\/span><\/li>\n<\/ol>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"Submitting_Your_Application_To_Dewa\"><\/span><span style=\"font-weight: 400;\">Submitting Your Application To Dewa<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul style=\"text-align: justify;\">\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Applying_Online_Through_the_Dewa_Portal\"><\/span><span style=\"font-weight: 400;\">Applying Online Through the Dewa Portal<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">To submit your application online\u2013<\/span><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Access DEWA\u2019s official website and log in to the online portal<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Fill in your personal or business information, including your Emirates ID or Trade License.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Submit all required documents, such as site plans, NOCs, load schedules, and schematic diagrams.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Complete the application and submit it for review.<\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"text-align: justify;\">\n<h3><span class=\"ez-toc-section\" id=\"Applying_Offline_At_Dewa_Customer_Service_Centre\"><\/span><span style=\"font-weight: 400;\">Applying Offline At Dewa Customer Service Centre<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">To submit your application offline\u2013<\/span><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Visit any DEWA customer service centre.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Submit all necessary documents to the service representative.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Complete any additional forms required at the centre.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Hand over the completed application for processing.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It&#8217;s important to provide accurate and thorough information to ensure an efficient application process and to help DEWA process your request efficiently.<\/span><\/p>\n<ol style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><strong>Customer Information<\/strong>\u2013 Emirates ID is for individuals, and a Trade License is for businesses.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><strong>Project Details<\/strong>\u2013 Nature of modification and specific technical requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><strong>Supporting Documents<\/strong>\u2013 Site plan, NOCs, load schedule, schematic diagrams, affection plan (if applicable), and site layout plan.<\/span><\/li>\n<\/ol>\n<h2 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"How_Do_You_Request_Dewa_Electricity_Network_Modification\"><\/span><span style=\"font-weight: 400;\">How Do You Request Dewa Electricity Network Modification?<\/span><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Applying for an electricity network change in DEWA requires a specific format considering safety, code, and quality. To modify the electricity network, arrange the needed documents, fill out the detailed application, pay the relevant fees, and have the technical review, inspection, final execution, and approval. Through this process, DEWA can ensure that all modifications are of high quality and align with the smart city concept, as well as enhance the reliability of the electricity supply in Dubai.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"1_Pre-Application_Requirements\"><\/span><span style=\"font-weight: 400;\">1. Pre-Application Requirements<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Collect and secure all the necessary documents, such as the site plan, No Objection Certificates (NOCs), load schedule, schematic diagrams, and any required approvals from Dubai Municipality or other regulatory bodies.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"2_Submission_of_the_Application\"><\/span><span style=\"font-weight: 400;\">2. Submission of the Application\u00a0<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Submit your application through DEWA\u2019s online portal or at a <strong>DEWA customer service centre<\/strong>, providing detailed customer information (Emirates ID or Trade License), project details, and supporting documents.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"3_Fees_and_Payment\"><\/span><span style=\"font-weight: 400;\">3. Fees and Payment\u00a0<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">DEWA\u2019s portal offers service requests for free, but the modification service may incur some fees. The cost of the modification depends on the type and scale of work performed and can be made through <strong>DEWA\u2019s electronic payment services<\/strong>.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"4_Site_Inspection_and_Technical_Review\"><\/span><span style=\"font-weight: 400;\">4. Site Inspection and Technical Review<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">DEWA&#8217;s technical team reviews the application and documents. They might inspect the site to evaluate whether the requested modifications are feasible and compliant.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"5_Implementation_And_Permission\"><\/span><span style=\"font-weight: 400;\">5. Implementation And Permission<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">After review and inspection, DEWA provides an approval letter and a detailed modification plan and schedule.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"6_Process_Execution\"><\/span><span style=\"font-weight: 400;\">6. Process Execution<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">DEWA or an authorised contractor conducts the modification work per the approved plan. This entails the installation of new equipment, testing, commissioning, and final inspection.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span class=\"ez-toc-section\" id=\"7_Completion_And_Handover\"><\/span><span style=\"font-weight: 400;\">7. Completion And Handover<\/span><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Finally, DEWA issues the completion certificate and new documentation that may include the changes implemented to meet the modified network.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">To Sum It<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The application for modifying the electricity network with DEWA follows a clear procedure that ensures safety, legal requirements, and effectiveness. You can change your electricity network by procuring the required documents, preparing a comprehensive application, paying for the related fees, subjecting the network to technical requirements assessments and site visits, executing the project, and obtaining final approval. This process, therefore, is carried out by DEWA with the assurance that any change meets the required quality and aligns with Dubai&#8217;s smart city objectives, particularly in providing a steady and clean electricity supply.<\/span><\/p>\n<p><strong>Similar Suggestions For You:<\/strong><\/p>\n<table style=\"width: 100.406%; height: 500px;\">\n<tbody>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>DEWA Bill Payments with Etisalat\u2019s &#8220;e&amp; Money App&#8221;<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/dewa-bill-payment-govt\"><b>DEWA Bill Payments<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>Police Clearance Certificate in Dubai<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/police-clearance-certificate-in-dubai-govart\"><b>Police Clearance Certificate in Dubai<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>Dubai Real Estate Business Ethics<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/dld-dubai-real-estate-ethics-govart\"><b>Dubai Real Estate Ethics<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>Esaad Card in UAE<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/esaad-card-in-uae-govt\"><b>Esaad Card in UAE<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>Top Etisalat Offices in Dubai<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/etisalat-office-in-dubai-govart\"><b>Etisalat Offices in Dubai<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>Draft a\u00a0 Memorandum of Association<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/memorandum-of-association-govart\"><b>Memorandum of Association<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>High DEWA Bill Resolution<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/high-dewa-bill-resolution-govart\"><b>High DEWA Bill Resolution<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-size: 10pt;\"><b>Know About Etihad Water and Electricity (EtihadWE)<\/b><\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-size: 10pt;\"><a href=\"https:\/\/www.squareyards.ae\/blog\/etihad-water-and-electricity-govart\"><b>Etihad Water and Electricity (EtihadWE)<\/b><\/a><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions_FAQs\"><\/span>Frequently Asked Questions (FAQ&#8217;s)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"text-align: justify;\">\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"What_is_the_first_thing_to_remember_when_requesting_an_electricity_network_modification_from_Dewa\"><\/span>What is the first thing to remember when requesting an electricity network modification from Dewa?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tThe first step is to gather all necessary documents, including the site plan, NOCs, load schedule, and schematic diagrams.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"Are_there_any_fees_associated_with_the_application_process\"><\/span>Are there any fees associated with the application process?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tThere is no fee to request the service through DEWA\u2019s portal; however, the modification service itself may incur charges depending on the nature and extent of the modification.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"How_can_I_submit_my_application_for_an_electricity_network_modification\"><\/span>How can I submit my application for an electricity network modification?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tYou can submit your application through DEWA\u2019s online portal or visit any DEWA customer service centre.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"Who_is_responsible_for_carrying_out_the_modification_work\"><\/span>Who is responsible for carrying out the modification work?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tDEWA or its authorised contractors execute the modification work.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"What_does_the_execution_of_the_modification_work_involve\"><\/span>What does the execution of the modification work involve?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tThe execution includes installing new equipment, testing and commissioning the system, and a final inspection to ensure compliance with DEWA\u2019s standards.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"What_is_the_cost_of_an_electricity_network_modification\"><\/span>What is the cost of an electricity network modification?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tThe cost varies depending on the specific modification required. The nature and extent of the modification work determine the fees.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"Who_should_we_contact_for_our_queries_about_network_modifications\"><\/span>Who should we contact for our queries about network modifications?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tYou can contact DEWA through their customer service centres, 24\/7 call centre at 991 or their official website.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"sc_fs_faq sc_card \">\n\t\t\t<div>\n\t\t\t\t<h3><span class=\"ez-toc-section\" id=\"What_are_the_advantages_of_working_with_DEWA_for_network_modifications\"><\/span>What are the advantages of working with DEWA for network modifications?<span class=\"ez-toc-section-end\"><\/span><\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t\t\t\t\t<p>\n\t\t\t\t\t\tWorking with DEWA ensures compliance with stringent safety and regulatory standards, access to expert technical support, and a streamlined process for efficient network modifications.\t\t\t\t\t<\/p>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\n<script type=\"application\/ld+json\">\n\t{\n\t\t\"@context\": \"https:\/\/schema.org\",\n\t\t\"@type\": \"FAQPage\",\n\t\t\"mainEntity\": [\n\t\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"What is the first thing to remember when requesting an electricity network modification from Dewa?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"The first step is to gather all necessary documents, including the site plan, NOCs, load schedule, and schematic diagrams.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"Are there any fees associated with the application process?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"There is no fee to request the service through DEWA\u2019s portal; however, the modification service itself may incur charges depending on the nature and extent of the modification.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"How can I submit my application for an electricity network modification?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"You can submit your application through DEWA\u2019s online portal or visit any DEWA customer service centre.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"Who is responsible for carrying out the modification work?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"DEWA or its authorised contractors execute the modification work.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"What does the execution of the modification work involve?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"The execution includes installing new equipment, testing and commissioning the system, and a final inspection to ensure compliance with DEWA\u2019s standards.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"What is the cost of an electricity network modification?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"The cost varies depending on the specific modification required. The nature and extent of the modification work determine the fees.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"Who should we contact for our queries about network modifications?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"You can contact DEWA through their customer service centres, 24\/7 call centre at 991 or their official website.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"What are the advantages of working with DEWA for network modifications?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"Working with DEWA ensures compliance with stringent safety and regulatory standards, access to expert technical support, and a streamlined process for efficient network modifications.\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t\t\t\t]\n\t}\n<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>The Dubai Electricity and Water Authority (DEWA) provides electricity and water services to Dubai&#8217;s residents. Among its various services, DEWA Electricity allows registered contractors and consultants to request modifications to the electricity network, such as relocating meters, substations, or cables. This blog outlines the steps and requirements for requesting such modifications, specifically focusing on requesting [&hellip;]<\/p>\n","protected":false},"author":42,"featured_media":70605,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[60,59,68,64],"class_list":["post-70601","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-dubai","category-uae","category-uae-government","category-uae-guide"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/posts\/70601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/users\/42"}],"replies":[{"embeddable":true,"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/comments?post=70601"}],"version-history":[{"count":4,"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/posts\/70601\/revisions"}],"predecessor-version":[{"id":70865,"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/posts\/70601\/revisions\/70865"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/media\/70605"}],"wp:attachment":[{"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/media?parent=70601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.squareyards.ae\/blog\/wp-json\/wp\/v2\/categories?post=70601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}